STRICT RAW MATERIAL CONTROL STANDARDS
Dual Inspection Mechanism
All raw materials require authoritative
test reports from suppliers, followed by
secondary re-inspection by our technical
department prior to warehouse entry
Pre-production Lab Verification
Samples are manufactured and subjected to full-item testing to ensure 100% compliance with
physicochemical indicators before mass
production approval
Dynamic Production Monitoring
Continuous tracking of material stability with immediate response protocols for abnormalities.
END-TO-END PRODUCTION PROCESS CONTROL
ONE
Precision Semi-finished Product Dimension Control
Strict adherence to technical card standards, implementing piece-by-piece inspection for 12 defect types including dimensional tolerances and cracks.
Dual-track system combining "random machine sampling" with "full -truck inspection", with defective products immediately scrapped and traced back to responsible machines.
Dual-track system combining "random machine sampling" with "full -truck inspection", with defective products immediately scrapped and traced back to responsible machines.
TWO
Semi-finished Product Porosity & Density Management
Mandatory per-machine/per-batch checks for unit weight, pressing frequency, and porosity sampling, with real-time data logging into the quality traceability system.
Automatic shutdown triggered upon key parameter deviations to prevent defect propagation.
Automatic shutdown triggered upon key parameter deviations to prevent defect propagation.
THREE
Standardized Kiln Loading Procedures
"100% Pre-firing Re-inspection" system with automatic sorting of defective products to waste zones.
Proprietary "3D Stacking Positioning Method" ensuring <=1mm error in brick pile alignment.
Proprietary "3D Stacking Positioning Method" ensuring <=1mm error in brick pile alignment.
FOUR
Digital Firing Process Management
Precision Temperature Control: Al-driven thermal regulation with hourly firing curve recording; ±5°C deviation triggers auto-alert.
Equipment Assurance: Triple-check system ("Operator-Inspector-InstrumentTechnician") with daily calibration and e-records for all gauges.
Equipment Assurance: Triple-check system ("Operator-Inspector-InstrumentTechnician") with daily calibration and e-records for all gauges.
FIVE
Finished Product Final inspection Protocol
Automated Sorting Line: High-precision laser gauges perform piece-by-piece verification with automatic rejection of out-of-tolerance items.
Traceability Coding: Qualified products receive unique quality IDs per batch for full lifecycle tracking.